跳到主要內容

Managing Change in Construction Projects

$3959元 定價: $4399 9折 可訂購

也可以到門市自行翻閱這本書

店內位置

下單選門市自取可使用文化幣
有團購需求請加官方LINE詢問

LINE US!
直接購買
作者
Sepani Senaratne、Martin Sexton
出版社
John Wiley
ISBN
9781444335156
出版日期
2011/03

簡介

Managing Change in Construction Projects: a knowledge-based approach offers a new perspective on construction project change by viewing the process of change management as a knowledge-intensive activity, where team members bring their tacit and explicit knowledge into the situation; share, create and capture this collective knowledge for future re-use in similar situations. Through this knowledge-based approach, construction teams can successfully resolve and learn from change events, leading to an overall improved performance of the industry. The book will make a significant contribution to our understanding of construction project change by offering new theoretical and practical insights and models grounded in results of case studies conducted within two collaborative construction project team settings. By demonstrating how the social construction of knowledge works in construction settings, the authors challenge the prevailing change management solutions based on ‘hard’ IT approaches. They put forward a balanced view that incorporates both IT–based and socially constructed approaches to effective management of construction project change. helps construction managers to improve and learn through the process of construction project change presents new theoretical models and offers practical guidelines first research-based book to directly address project change from a knowledge-based perspective draws on detailed studies with construction companies, including Ballast Construction and Kier Construction encourages a move from the information driven, process integrated approach to a knowledge-based view

目錄

About the Authors. Chapter 1 Introduction. 1.1 Background. 1.2 Need for the Investigation. 1.3 Questions to Research. 1.4 Summary and Link. Chapter 2 Key Issues from the Literature. 2.1 Introduction. 2.2 Construction Project Environment. 2.3 Construction Project Change Management. 2.4 Knowledge Management Perspective. 2.5 Role of Knowledge During Reactive Change Process. 2.6 Towards a Knowledge-Based Reactive Change Process. 2.7 Summary and Link. Chapter 3 Research Methodology. 3.1 Introduction. 3.2 Case Study Research Design. 3.3 Data Collection Process. 3.4 Data Analysis Process. 3.5 Summary and Link. Chapter 4 Case Study Results. 4.1 Introduction. 4.2 Case Study: Project A. 4.3 Case Study: Project B. 4.4 Summary and Link. Chapter 5 Cross-Case Analysis. 5.1 Introduction. 5.2 Contextual Factors of Change: P1 Discussion. 5.3 Knowledge Properties During Change: P2 Discussion. 5.4 Knowledge Identification and Utilisation During Change: P3 Discussion. 5.5 Intra-Project Knowledge Creation During Change: P4 Discussion. 5.6 Inter-Project Knowledge Transfer During Change: P5 Discussion. 5.7 Summary and Link. Chapter 6 Conclusions. 6.1 Introduction. 6.2 Summary of Propositions. 6.3 Comment on the Conceptual Model. 6.4 Conclusions about the Overall Research Problem. 6.5 Implications for Theory. 6.6 Implications for Practice. Appendix A Interview Guidelines. Appendix B Example of an Interview Transcript. Appendix C Comparison Between Propositions and Codes. References. Index.

為您推薦